Trash Collecting Equipment on Hrazdan River

07.03.2025

Two units of trash collecting equipment have been installed on the Hrazdan River, to prevent pollution of the river and Yerevan Lake. The approximate amount spent on the design and installation of these waste collection equipment is 122 million drams.

 

Video

Աղբաորսիչ սարքեր՝ Հրազդան գետի վրա